Your owner builder command centre.
Upload your plans and SiteForeman builds your project for you — a priced, stage-by-stage cost estimate and a Gantt timeline of your whole build, generated automatically in the right trade order. Then send professional quote requests to tradies, compare the quotes against the estimate, track your budget and stay on top of mandatory inspections, without needing a licensed builder to hold your hand.
$349 AUD per build project · one-time payment, no subscription
SiteForeman produces automated cost estimates for planning — not quotes, and not professional building, financial or legal advice. Always obtain written quotes from licensed tradespeople, and confirm permit and inspection requirements with your state or territory regulator. See our Terms.
A quick look at SiteForeman — upload your plans, get a stage-by-stage estimate, and run your build from one place.
From the day you upload your plans through to the final inspection.
Upload your building plans PDF. SiteForeman reads the drawings — build type, scope and the measurements that drive your costs — and checks its understanding with you before pricing anything.
A stage-by-stage cost estimate measured from your plans, before a single quote comes in. Based on published Australian construction rates, with a price range for every trade. An estimate for planning — not a quote.
Your build program, generated from your estimate in the right trade order. Set dates, track progress, and see where you are in the project.
Generate professional request-for-quote emails scoped to each stage, log the prices as they come back, and compare quotes side by side against your estimate.
Track committed costs (accepted quotes) and invoices paid against your estimate. Know your cashflow position at every stage of the build.
Keep mandatory inspections in view. State-aware checkpoints sit in your timeline as blocking items, so a hold point is on your program rather than something you remember too late.
Real screens from a sample project — the same build, followed from plans through to budget.
Upload the PDF and SiteForeman works out what is being built — foundation type, cladding, roof, storeys, what is in scope and what is not. You check its reading before anything is priced. Then every stage is costed from published Australian trade rates.

Your timeline is generated from the same numbers as the estimate, in the right trade order. Jobs chain forward off each other, so setting one date reschedules everything after it. Inspection hold points sit in the program as blocking items.

Send scoped quote requests to trades, then log the prices as they come back. Every stage shows what you were quoted next to what it should cost, so a number that is out of line is obvious rather than buried.

Accepted quotes become committed costs. Invoices track against them. You can see what you have committed, what you have actually paid, and what is still to come — which is the number that matters when the money gets tight at lock-up.

Upload your building plans PDF. SiteForeman reads them, confirms the scope of your build with you, then measures the drawings.
Get a stage-by-stage cost estimate and a build timeline built from the same numbers. Then generate and send professional RFQ emails to tradies.
Compare quotes, accept the best ones, track invoices against your budget, and tick off inspections as you go.
The Australian building timeline, state-specific mandatory inspections, and RFQ emails written to be taken seriously by Australian trades. Not a generic project management tool retrofitted for construction.
Built by an owner builder who did it without experience. Read why
The things owner builders ask before they start.
More detail in our owner builder guides and blog.
Set up your project in minutes. Upload your plans and get your first cost estimate today.
Get started →